Use case β€” Construction

Your plumber doesn't show up Monday.
4 trades are blocked in cascade.

Unexpected absence. Materials delayed. Adverse weather. Your MS Project schedule shows the plan β€” not how to recover. Xenaflow recalculates sequences and coordinates every trade in real time.

Job Site Schedule β€” Tuesday 07:15 Mon Tue Wed Thu Fri STRUC- TURAL FOUNDATIONS + FRAMING ELEC CABLE TRAYS + WIRING PLUMB- ING SUPPLY + DRAINAGE SUBCONTRACTOR ABSENT β€” PLUMBING BLOCKED DRY- WALL LINING + PARTITIONS MOVED FROM THU β†’ TUE PAINT- ING PAINTING + FINISHING +1D Plumber absent 2 lots advanced Schedule held Delay D+0
Real-world scenario

Tuesday, 7:15 AM β€” Commercial renovation site, Lille

8 workers, 5 trades, a tight schedule with late-delivery penalties. The plumber calls in sick. By 8 AM, the entire second-fix sequence is at risk.

Subcontractor absence

The plumber calls in sick at 7:15 AM. Their work is a prerequisite for the drywaller and painter. 3 days of cascading schedule impact are at risk.

Critical β€” Immediate

Material delivery delay

The drywall panels scheduled for this morning are postponed to tomorrow. Even if the drywaller could start, there's no material to work with.

Critical β€” Time-sensitive

Adverse weather D+1

Rain forecast for Wednesday. Exterior work (waterproofing, cladding) will need to be postponed. Impact on the critical path if not anticipated.

High β€” Cascading

Late-delivery penalty approaching

The client has set a firm handover date. Every day of delay triggers a contractual penalty of $550/day.

High β€” Financial risk
Xenaflow response

What happens in the
next 15 minutes

Xenaflow detects the absence, maps the dependencies between trades and generates reorganization scenarios β€” before the first call to the subcontractor.

T+0 min β€” 7:15 AM

Absence detected

The plumber is marked as absent. Xenaflow instantly identifies the 3 dependent work packages (drywaller, painter, finishing) and calculates the critical path impact.

T+3 min β€” 7:18 AM

Dependencies mapped

The material delay is cross-referenced. The drywaller is doubly blocked. Wednesday's weather is factored in. A complete constraint map is generated.

T+8 min β€” 7:23 AM

3 scenarios proposed

Xenaflow generates three actionable options, each with quantified trade-offs: cost, delay, penalty impact, overtime hours.

T+15 min β€” 7:30 AM

Site reorganized, trades notified

The project manager approves Scenario B. The electrician extends their scope. The drywaller is rescheduled to Thursday. A replacement plumber is confirmed for Wednesday.

Scenarios generated by Xenaflow

Scenario A

Advance independent work packages

Extend the electrician onto ancillary work. Postpone plumbing and drywall to Thursday. Painting shifted by 2 days.

No extra cost 2-day delay $1,100 penalty
Scenario B β€” Recommended

Replacement plumber + reorganization

Mobilize a plumber through the temp network for Wednesday. Extend the electrician onto ancillary cable runs Tuesday. Drywaller maintained for Thursday.

Moderate cost 0-day delay Penalty avoided
Scenario C

Saturday overtime day

Postpone plumbing to Wednesday (original plumber recovered). Add Saturday to catch up on drywall and painting.

Overtime 0-day delay Penalty avoided
Impact

The same week, with and
without Xenaflow

Without Xenaflow Manual coordination
2 hours of phone calls

The project manager calls each subcontractor one by one, negotiates reschedules manually.

Late-delivery penalty triggered β€” $1,650

3-day slip. The handover date is missed. The penalty clause kicks in.

Drywaller and painter idle for 2 days

No reorganization in time. Two crews paid to do nothing.

Weather not anticipated, exterior work blocked

The cladding planned for Wednesday is cancelled at the last minute. Another day lost.

With Xenaflow Orchestrated response
15 minutes to a reorganized site

Absence detected, dependencies mapped, scenario approved β€” all before 7:30 AM.

Zero late-delivery penalty

Replacement plumber mobilized. Schedule held. Handover date met.

No crew left idle

The electrician extends onto ancillary work. The drywaller is rescheduled without a gap.

Weather factored into the scenario

Exterior work is anticipated and shifted before the crew arrives on site.

Live orchestration

From disruption to resolution β€”
in a single flow

DISRUPTION Plumber absent Materials delayed 🔍 DETECTION 3 dependent packages mapped Drywaller blocked Materials + plumbing DEPENDENCIES 5 trades Penalty D+3 $550/day XENAFLOW 3 scenarios generated DECISION Scenario B Subcontractors notified Schedule updated Materials rescheduled Client informed T+0 T+3 MIN T+8 MIN T+12 MIN T+15 MIN
Coordination

Every actor, one single layer
of orchestration

Xenaflow doesn't just alert β€” it coordinates. Every role receives the right information, the right action, at the right time.

Project Manager

Sees all site disruptions on a single screen. Approves the scenario, launches the reorganization in one click.

Scenario selection Schedule adjustment

Site Foreman

Receives the updated schedule on their device. Knows who does what, when, and in which order. No confusion on the ground.

Daily schedule Work sequence

Subcontractor

Notified immediately of their new time slot. No waiting on site, no wasted trips.

Confirmed slot Instructions

Client

Full visibility on progress, disruptions and decisions taken β€” without micro-management.

Progress tracking Deadline impact
Measurable impact

What construction teams
measure with Xenaflow

-68%
Reaction time to disruptions
From 2h to ~15 min
-45%
Late-delivery penalties
Reorganized before cascade
0
Unanticipated lost days
Every disruption has a plan B
+30%
Original schedule compliance
Less drift, more control
Ecosystem

Connects to your existing stack

Xenaflow connects to the tools your site teams already use β€” no replacement, just orchestration on top.

Project Scheduling

Planning & sequencing tools

MS Project Primavera P6 BatiScript Planno

Construction ERP

Enterprise resource planning for construction

Sage Construction Cegid Onaya EBP Construction

DMS & Plans

Document management & BIM models

Autodesk BIM 360 Trimble Connect Bulldozair

Field Time Tracking

Attendance & time tracking

ProGBat Alobees Timetask Kizeo

HR & Temp Staffing

Agencies & workforce management

Manpower Adecco Randstad Proman

Communication

Alerts & team coordination

Microsoft Teams WhatsApp Business Email / SMTP SMS

Custom connectors available via REST API & webhooks β€” if your tool has an API, Xenaflow can talk to it.